Low Cost Shipping
LIMITATIONS:
Areas with rush must be spot primed. A test patch should be applied to any roof that has been coated with a factory finish. We strongly recommend that proper adhesion to your factory finish be tested using the Adhesion Tape Test as defined by ASTM D-3359.
PRECAUTIONS:
Apply only at temperatures from 40º F to 90º F (air and surface). Do not paint if rain is forecast within the tack-free time. Starting after 10am and stopping by 4pm gives best results. Condensation on wet paint film will flatten the finish of the coating prematurely and unevenly, but does not affect adhesion or durability. Never paint over condensation. Painting at temperatures above 90º F will cause all coatings to dry too quickly, resulting in poor adhesion and flexibility. Refer to the Material Safety Data Sheet for complete health and environmental information.
SPECIFICATION REFERENCES: